
Project: Complete Design of Wind turbine boat landing, Accesses platform, Airtight platform & J-tubes
The whole work is carried out by using DNV & other EU design codes, this project include Basic Design, Structural detailed design calculations & fabrication Drawings.
Project: Sale of Two tug boats
The sale of two tug boats from one of our esteemed client Shipyardcyprus and the tug details are attached below.